PG-MUX-II family
products

Doubled PG-interface +++ HMI and PG parallel to S5-PLC +++ Prof. device, of active ports +++ Universal power supply +++ All connections on the front +++ For Siemens S5-90U-155U

Doubles PG-interface +++ HMI and PG parallel to S5-PLC +++ Profi-device, as active ports

Doubles PG-interface +++ HMI and PG parallel to PLC +++ Profi-device, as active ports

Doubled PG-interface +++ HMI and PG parallel to PLC +++ Prof.device, active ports +++ All connections on the front +++ For BOSCH CL200/300/400

Doubles PG-interface +++ HMI and PG parallel to PLC +++ Profi-device, as active ports

Doubles PG-interface +++ HMI and PG parallel to PLC +++ Profi-device, as active ports

Doubles PG-interface +++ HMI and PG parallel to PLC +++ Profi-device, as active ports
- Devices are advanced versions of the world widely used PG-MUX
- All connectors and controls on the front
- Permanent checking of the device functions and power supply => restart at failure
- Right away ONLINE with both interfaces to the PLC
- All PD functions can be accomplished parallel by 2 PD’s
more...
- Devices are advanced versions of the world widely used PG-MUX
- All connectors and controls on the front
- Permanent checking of the device functions and power supply => restart at failure
- Right away ONLINE with both interfaces to the PLC
- All PD functions can be accomplished parallel by 2 PD’s
- Provided PLC’s: S5-90U to S5-155U, AEG A120 and A250, Bosch CL 200 and CL 300 and CL 400, Klöckner-Moeller PS3 and PS4-201, Mitsubishi FX-series and A-series
- No additional or specific adapters are needed
- Connecting mechanics, pin assignment and the electrical data correspond to the PD/PLC-interfaces of the relevant PLCs
- Capability of connecting on PD-side: 2 x PD's / 2x OP/Panel / 1x PD + 1x OP/Panel
- 3m cable for PLC-connection included in delivery
- Possible supply-voltages: 24V DC and/or 230V AC or 115V AC (US-version)

Your Programming-interface of the PLC is already occupied with a panel or PC or communication-processor?
You should accomplish program modifications without removing the other communication-partner? You connect the
PLC-specific Multiplexer one-time to the PLC and then connect the communication-partner and also your PC.
Now you can work parallel with the PLC without the need of affecting the operation/communication of the panel/CP.
You can even work with 2 programming devices simultaneously, 2x open the same block, only changes which are stored at
last will be finally stored in the PLC. Also ideal for trainings purposes if PLC’s with IO´s are scare goods.
Multiplexer-devices of the PG-MUX-II-family are the ultimate service-device, regardless of what you plug into the
two PG-sockets, both participants communicate parallel with the controller.
PD-interface-multiplexer

PD-Interface Multiplexer Lightversion (passive)

Supply 2 PD’s with 24V and 5 V at a S7-200 / 300 / 400 AG interface